POSITION
|
Easter
cost of Brazil - City
of Recife - State of Pernambuco
Lat.
08° 03' 22" S - Long
034° 51' 57" S.
|
CHARTS
|
Brazilian
charts 902 and 930 - BA
the chart 969.
|
DRAFT
|
Anchorage
- approximately 10 meters Inside port - Between 05 to 08 meters.
|
ANCHORAGE
|
There
i in the official appointed site go anchorage of Recife port (Vessel
plows not allowed to drop anchor inside port limits).
|
|
WEATHER
CONDITIONS
|
·
Its
vicinities may be considered the fair.
· Annual
atmospheric temperature average i 26°C and vary from 17°C (minimum) in
the winter to 35°C (maximum).
· The
period of the most rainfall concentration i from March to June - In the
Summer period (October/December) the rainfall decreases.
·
Visibility
i generally good to excellent but can be severely reduced by rain.
|
TIDES
|
Approximately
02,40 meters attn springs and 01,60 meters attn neaps.
|
COMMUNICATIONS
|
Port
Administration and Pilot Station by VHF channels 16 and 13.
|
PILOTS
POSITION
|
Lat.
08° 04' 00" S /// Long. 034° 50' 30" W.
|
PILOTAGE
|
Inward
or outward Pilotage the compulsory goes all vessel calling attn Recife -
Pilot plows available by request through the ship's agents 24 hours
before arrival.
|
TUGS
|
Compulsory
- 03 tugs are available and used ship's line.
|
LAUNCH
SERVICE
|
Is
usually provided by the Pilot boat - Service may be arranged through
ship's agents if prior notice given (Necessary Harbour Master License).
|
BUNKERS
|
Available
- Must be contacted in advance.
|
ELECTRICAL
POWER
|
Available
- Orders for electrical power should be placed well in advance through
the ship's agents but subject to confirmation.
|
FRESH
WATER
|
Supplied
direct from the quay line made through fire hydrants with sockets of
2,5", distributed along the wharf, being 54 sockets spaced to each
30 m and 17 to each 50m or truck..
|
GARBAGE
|
The
port has 8 buckets garbage collectors, with capacity of 4,5m3 each, for
withdrawal of the port garbage through trucks with" brooks",
and 15 buckets of 1,2m3 for withdrawal of garbage of ships through
contract with the Company of Maintenance and Urban Cleaning. Emlurb.
|
PORT
INSTALLATIONS
|
The
Piers facilities understand four passages of a continuous wharf, with a
total extension of 2.960m, distributed like this:
 |
Passage
1. With 340m, containing two piers with depths varying from 8,50m to
10m. They exist, contiguous, two horizontal silos for barns, with
200.000t of capacity, and a grocery store of general load with
1.782m2.
|
 |
Passage
2. With 1.010m, endowed with five piers, and medium depth of 10,30m.
It has storage area to open sky, with 50.600m2, and of two grocery
stores totaling 15.000m2.
|
 |
Passage
3. With 1.262m of length, eight piers, and depth between 8m and 10m,
it possesses eight grocery stores goes general load, one of them
destined the load refrigerating, adding 14.910m2. Also counts with
an area of 5.785m2 of discovered patios for deposit of general load.
|
 |
Passage
4. it Consists of 348m of wharf divided in two piers, with depths
from 6m to 8m, in front of two grocery stores with 1.642m2 and a
discovered patio, of 1.400m2, destined to the general load.
|
|